The circuit serving one of the PDUs in rack AZ-49 is reading 37A off a 30A breaker with only about 15A of load from the rack. Rene wants to schedule to have an electrician look at it to determine the problem but that involves shutting the circuit down. There are electricians onsite for the cubicle install that he can have look at it today if we can shut things down. If we need to schedule this further out, that's fine as well, we just need to let Rene know when. The following machines are in that rack and served ONLY from the affected circuit and would go down: marne-1 marne-2 marne-3 marne-4 linksys mgmt switch top of rack The following are in the rack but have dual fed power: kasserine-5 area51 warehouse13 metro-2 Given the track record of failing over circuits, I'd say there's a plausible chance for even some or all of the dual fed machines to go out. So is today acceptable for short notice outage, or do we need to schedule out further. _______________________________________________ This is the CELS Sysadmins mailing list. It is sent to memebers of [email protected] and [email protected]. Do not subscribe directly to this list. Thanks.
Schedule out further - we need to sync w/SEED and MG-RAST on this. -- Craig From: [email protected] [mailto:[email protected]] On Behalf Of Leggett, Torrance I. Sent: Wednesday, November 19, 2014 8:37 AM To: CELS Admins Subject: [CELS Sysadmins] PDU for rack AZ-49 (IGSB) The circuit serving one of the PDUs in rack AZ-49 is reading 37A off a 30A breaker with only about 15A of load from the rack. Rene wants to schedule to have an electrician look at it to determine the problem but that involves shutting the circuit down. There are electricians onsite for the cubicle install that he can have look at it today if we can shut things down. If we need to schedule this further out, that's fine as well, we just need to let Rene know when. The following machines are in that rack and served ONLY from the affected circuit and would go down: marne-1 marne-2 marne-3 marne-4 linksys mgmt switch top of rack The following are in the rack but have dual fed power: kasserine-5 area51 warehouse13 metro-2 Given the track record of failing over circuits, I'd say there's a plausible chance for even some or all of the dual fed machines to go out. So is today acceptable for short notice outage, or do we need to schedule out further. _______________________________________________ This is the CELS Sysadmins mailing list. It is sent to memebers of [email protected] and [email protected]. Do not subscribe directly to this list. Thanks.
participants (2)
-
Leggett, Torrance I. -
Stacey, Craig J.