Re: [petsc-dev] every test example runs in a new directory with new test harness
Probably not [yet]. one potential issue is 'nsize' is listed separately [to mpiexec].. Satish On Sun, 5 Feb 2017, Barry Smith wrote:
Does the test harness support this? If so it sounds like an ok solution
On Feb 5, 2017, at 9:41 PM, Satish Balay <[email protected]> wrote:
Perhaps the following could be converted into a single run script with 2 mpiexec commands.
test: suffix: restart_0 requires: hdf5 args: -run_type test -refinement_limit 0.0 -bc_type dirichlet -interpolate 1 -petscspace_order 1 -dm_view hdf5:sol.h5 -vec_view hdf5:sol.h5::append args: -run_type test -refinement_limit 0.0 -bc_type dirichlet -interpolate 1 -petscspace_order 1 -f sol.h5 -restart <<<<<<<
Satish
On Sun, 5 Feb 2017, Barry Smith wrote:
test: suffix: restart_0 requires: hdf5 args: -run_type test -refinement_limit 0.0 -bc_type dirichlet -interpolate 1 -petscspace_order 1 -dm_view hdf5:sol.h5 -vec_view hdf5:sol.h5::append
test: suffix: restart_1 requires: hdf5 args: -run_type test -refinement_limit 0.0 -bc_type dirichlet -interpolate 1 -petscspace_order 1 -f sol.h5 -restart
See a problem?
Should the same run of the example view the files and then load them back in? versus trying to read in a data file from another run that may not even have been created before and even if it was, the file was definitely created in a different directory?
I think that if you want to do this kind of test the same example must first write the file and then read it back in. Cannot assume any relationship between different runs of tests with parallel scheduling.
Barry
participants (1)
-
Satish Balay