[CELS Sysadmins] LMS Procedure for cabling
An LMS Procedure is in the works for cabling, which I've attached. Let me know if you have any issues with it. == Craig _______________________________________________ This is the CELS Sysadmins mailing list. It is sent to memebers of: [email protected], [email protected], [email protected], [email protected]. Do not subscribe directly to this list. Thanks.
My comments: - what is the intent of this? It says it is mandatory for areas that change divisional ownership. Is that really the only time it is intended to apply? - for how long after the ownership change does this apply? After one survey? Forever and anon? The exclusion says: Areas containing only cabling owned and operated by the division or organization performing the work. - Clearly, Bldg 369 / ISSF qualifies, but what about the TCS machine room? - How big is an area? Is the entire machine room the area? Or is it the various rows that have been carved out for the different divisions? What are the limits of applicability? Clearly something like fiber running under ground between buildings would be covered, and clearly (I hope) changing a 2' long ethernet cable between a node and an in- rack switch would not, but where is the line in between those two extremes? Bill On Sep 22, 2010, at 3:19 PM, Craig Stacey wrote:
An LMS Procedure is in the works for cabling, which I've attached. Let me know if you have any issues with it.
== Craig <Cable Management Procedure 2010-09-21.pdf><Cabling Survey Work Request Form v1.2.pdf>_______________________________________________ This is the CELS Sysadmins mailing list. It is sent to memebers of: [email protected], [email protected], [email protected], [email protected]. Do not subscribe directly to this list. Thanks. _______________________________________________ aig mailing list [email protected] https://lists.alcf.anl.gov/cgi-bin/mailman/listinfo/aig
-------------------------------------------------------------- William (Bill) E. Allcock [email protected] Office 1123, Bldg 240 9700 S. Cass Ave Argonne, IL 60439 Office: 630-252-7573 Fax: 630-252-6585 Cell: 630-854-2842 The test of courage comes when we are in the minority. The test of tolerance comes when we are in the majority. - Ralph W. Sockman _______________________________________________ This is the CELS Sysadmins mailing list. It is sent to memebers of: [email protected], [email protected], [email protected], [email protected]. Do not subscribe directly to this list. Thanks.
On Sep 22, 2010, at 6:01 PM, William (Bill) E. Allcock wrote:
My comments:
- what is the intent of this? It says it is mandatory for areas that change divisional ownership. Is that really the only time it is intended to apply?
My understanding is that it is optional otherwise.
- for how long after the ownership change does this apply? After one survey? Forever and anon?
Good question. I'll raise this issue with the LMS team (as well as the ones below).
The exclusion says:
Areas containing only cabling owned and operated by the division or organization performing the work.
- Clearly, Bldg 369 / ISSF qualifies, but what about the TCS machine room? - How big is an area? Is the entire machine room the area? Or is it the various rows that have been carved out for the different divisions?
What are the limits of applicability? Clearly something like fiber running under ground between buildings would be covered, and clearly (I hope) changing a 2' long ethernet cable between a node and an in-rack switch would not, but where is the line in between those two extremes?
Bill
== Craig _______________________________________________ This is the CELS Sysadmins mailing list. It is sent to memebers of: [email protected], [email protected], [email protected], [email protected]. Do not subscribe directly to this list. Thanks.