Hi,
My simulation is having too many events rolled back, like 70%. It's
still relatively small scale, 16 cores on 4 nodes, using optimistic
scheduler. The result is attached.
Any general idea of reducing number of rollback events? I used the
max-opt-lookahead option and set it to 10000. Is it still a large number?
Thanks!